The new Waze Wiki, aka Wazeopedia, is now live at Wazeopedia.waze.com! While this legacy wiki will remain accessible for the time being, it is no longer updated by the community. For the most up-to-date guidance, please visit your local Wazeopedia.

Please do not make any more updates to these legacy wiki pages, all future updates should be made in your country's local Wazeopedia.

Clock over a larger globe

Difference between revisions of "Connecticut/Closures"

From waze
Jump to: navigation, search
(New Haven)
m (redirected)
 
(88 intermediate revisions by 9 users not shown)
Line 1: Line 1:
Use this page to keep track of '''LONG TERM''' Road Closures & Changes to Traffic Flow in the State of [[Connecticut]]. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read [[How to handle road closures]] before making changes to the map & this page.
+
{{USRedirect}}
 +
Use this page to keep track of '''LONG TERM''' road closures and changes to traffic flow in the State of [[Connecticut]]. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read [[Real time closures]] before making changes to the map and this page.
  
 +
<!-- These comments are very old and are likely more confusing to new editors
 
<del>Due to the current long cycle between map updates, only make map changes for closures that will last more than 2 months.</del>
 
<del>Due to the current long cycle between map updates, only make map changes for closures that will last more than 2 months.</del>
  
 
<del>On May 17th, 2012 Waze announced weekly map updates that would run each Sunday night (GMT) and would contain updates as of the previous Monday([http://status.waze.com/mapdate-may-17th]). Please only include map changes that will be in place 24 hours a day for at least one week, and be sure to plan your Construction updates accordingly (i.e. 2 weeks in advance).</del>
 
<del>On May 17th, 2012 Waze announced weekly map updates that would run each Sunday night (GMT) and would contain updates as of the previous Monday([http://status.waze.com/mapdate-may-17th]). Please only include map changes that will be in place 24 hours a day for at least one week, and be sure to plan your Construction updates accordingly (i.e. 2 weeks in advance).</del>
  
Due to Major Infrastructure Upgrades at Waze, there is no longer a consistent map tile update schedule, although we have been told that one is in the works (most likely 2-3 times a week).  At this point please only map closures that are in effect for more than two weeks.
+
<del>Due to Major Infrastructure Upgrades at Waze, there is no longer a consistent map tile update schedule, although we have been told that one is in the works (most likely 2-3 times a week).  At this point please only map closures that are in effect for more than two weeks.</del>
 +
    These del comments are currently not visible and likely should be removed.
 +
-->
 +
Waze is now consistently updating NA map tiles on a nightly basis. Map changes for road closures should be completed by [[24-hour format|2200 UTC]] in order to be included in the nightly updates. At this time please only map closures that are in effect for more than two weeks. And be sure to go back and update the closures as soon as work is completed.
  
== Bethel ==
+
== Major Events ==
 +
These are Major Events that are submitted to WazeHQ on a regular basis, typically yearly.
 +
{| border="1" width="100%"
 +
! scope="col" width="100" bgcolor="wheat"| What
 +
! scope="col" width="100" bgcolor="wheat"| When
 +
! scope="col" width="100" bgcolor="wheat"| Where
 +
! scope="col" width="100" bgcolor="wheat"| Link
 +
! scope="col" width="100" bgcolor="wheat"| Status
 +
|- align="center" bgcolor="yellow"
 +
| Hartford Marathon || Yearly<br>2nd Sat in Oct || Hartford<br>E/W Hartford || [http://www.hartfordmarathon.com/Events/NU_Hartford_Marathon/Road_Closures___CT_Transit.htm Closures] || 2014 - In Progress<br>[https://www.waze.com/forum/ucp.php?i=pm&mode=compose&u=16851422 (pumrum)]
 +
|}
 +
 
 +
== Minor Events ==
 +
These are Minor Events that are submitted via the closure sheet on a regular basis, typically yearly.
 +
{| border="1" width="100%"
 +
! scope="col" width="100" bgcolor="wheat"| What
 +
! scope="col" width="100" bgcolor="wheat"| When
 +
! scope="col" width="100" bgcolor="wheat"| Where
 +
! scope="col" width="100" bgcolor="wheat"| Link
 +
! scope="col" width="100" bgcolor="wheat"| Status
 +
|- align="center" bgcolor="lime"
 +
| Riverwalk || Yearly<br>July 4th Wknd || Hartford<br>E Hartford || [http://patch.com/connecticut/shelton/road-closures-for-riverwalk-fireworks-july-3 Closures] || 2014 - Submitted<br>[https://www.waze.com/forum/ucp.php?i=pm&mode=compose&u=16851422 (pumrum)]
 +
|- align="center" bgcolor="lime"
 +
| Manchester Road Race || Yearly<br>Thanksgiving Day || Manchester || [https://www.manchesterroadrace.com/CourseMapShell.html] || 2014 - Submitted<br>[https://www.waze.com/forum/ucp.php?i=pm&mode=compose&u=16851422 (pumrum)]
 +
|- align="center" bgcolor="white"
 +
| First Night Hartford || Yearly<br>New Years Eve || Hartford || [http://www.firstnighthartford.org/ Event Site] || 2014 - Not Yet Submitted
 +
|-
 +
|}
 +
 
 +
== Branford ==
 
{| border="1" width="100%"
 
{| border="1" width="100%"
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
Line 15: Line 49:
 
! scope="col" width="100" bgcolor="wheat"| Link
 
! scope="col" width="100" bgcolor="wheat"| Link
 
|- align="center"
 
|- align="center"
| [https://www.waze.com/editor/?lon=-73.39804&lat=41.39093&zoom=6&layers=BFTFFTTTTFTTFTTTTTTTTTTFT&segments=66943419,68260565,66943420 '''Walnut Hill Rd''']<br/>near Taylor Rd || 4/1/2013<br/>(CTGreybeard) || Anticipated<br/>9/18/2013 || '''BRIDGE CLOSED'''<br/>Rebuild aging bridge over Limekiln Brook on Walnut Hill Rd. || [http://www.bethel-ct.gov/controls/NewsFeed.aspx?FeedID=14 Town of Bethel]
+
| [https://www.waze.com/editor/?zoom=5&lat=41.28694&lon=-72.83399&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=66019910,62052284 '''Service Plaza''']<br/>I-95 N & S || 6/28/2012<br/>(AndyPoms) || NB:10/3/2013<br/>(AndyPoms)<br/>SB:Closed || '''SERVICE PLAZA CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
 
|-
 
|-
 
|}
 
|}
  
== Branford ==
+
== Bridgeport ==
 
{| border="1" width="100%"
 
{| border="1" width="100%"
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
Line 26: Line 60:
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="100" bgcolor="wheat"| Link
 
! scope="col" width="100" bgcolor="wheat"| Link
 +
|- align="center" bgcolor="#ffff00"
 +
| [https://www.waze.com/editor/?zoom=6&lat=41.18873&lon=-73.16687&layers=BTTFFTTTTFTTTTTTTTTTTTFTT&segments=9168431 '''Grant St''']<br/>b/w Central & Mill Hill || 6/28/2012<br/>(AndyPoms) || Unknown || '''PERMANENT CLOSURE '''<br/>Creation of Grant St Plaza - pedestrian area in front of Bridgeport Hospital.  Please leave the old (disconnected) segment as the plans show some form of access returning to the area (just no thru-traffic). || [http://www.bridgeportct.gov/controls/NewsFeed.aspx?FeedID=477 City of Bridgeport]
 +
|-
 
|- align="center"
 
|- align="center"
| [https://www.waze.com/editor/?zoom=5&lat=41.28694&lon=-72.83399&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=66019910,62052284 '''Service Plaza''']<br/>I-95 N & S || 6/28/2012<br/>(AndyPoms) || Unknown || '''SERVICE PLAZA CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
+
| [https://www.waze.com/editor/?zoom=7&lat=41.1689&lon=-73.19709&layers=BFTFFTTTTFTTTTTTTTTTTTTFTTTTTTTTTTTTT&segments=66947451 '''South Ave''']<br/>Under Amtrak || 7/26/2013<br/>(CTGreybeard) || 1/1/2014 || Replacement of Railroad Bridge No. 0853R Carrying the New Haven Rail line over South Avenue in the City of Bridgeport, Project #0301-0070 B || [https://encrypted.google.com/url?sa=t&rct=j&q=project%200301-0070%20b&source=web&cd=1&ved=0CCoQFjAA&url=http%3A%2F%2Fwww.ct.gov%2Fdot%2Flib%2Fdot%2Fdocuments%2Fdpolicy%2Fmtp%2F2009mtp.pdf&ei=7vvzUYjOLan94APvsYC4Bg&usg=AFQjCNFnQvgg3P5Cxx0vnXA-vBAFSZ-eOA&sig2=spJmNHa54rHCxLDttLRtWQ&bvm=bv.49784469,d.dmg&cad=rjt Connecticut Master Transportation Plan] (search for the project number)
 
|-
 
|-
 
|}
 
|}
  
== Chester ==
+
== Cheshire ==
 
{| border="1" width="100%"
 
{| border="1" width="100%"
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
Line 38: Line 75:
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="100" bgcolor="wheat"| Link
 
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center" bgcolor="#00FF00"
+
|- align="center" bgcolor="white"
| [https://www.waze.com/editor/?zoom=8&lat=41.40419&lon=-72.44911&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=69261145 '''Water St''']<br/>b/w N Main St & E Liberty St || 11/9/2012<br/>(AndyPoms) || 12/24/2012<br/>(AndyPoms)) || '''REOPENED'''<br/><del>'''BRIDGE REPLACEMENT'''</del><br/>Description || [http://chesterct.org/?p=883 Town of Chester]
+
| [https://www.waze.com/editor/?env=usa&lon=-72.87836&lat=41.53941&layers=5&zoom=7&segments=81025205 '''Blacks Rd''']<br/>btwn SR-10 & Wolf Hill || 2014-06-23<br/>(pumrum) || 2014-10-23 est<br/>(pumrum) || '''Added to Closure List || [http://www.cheshirect.org/roads-sidewalks-sewers-and-trees/road-maintenance-and-construction/ Town Closure Page]
 
|-
 
|-
 
|}
 
|}
  
== Darien ==
+
== Cornwall ==
 
{| border="1" width="100%"
 
{| border="1" width="100%"
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
Line 50: Line 87:
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="100" bgcolor="wheat"| Link
 
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
+
|- align="center" bgcolor="white"
| [https://www.waze.com/editor/?zoom=3&lat=41.07547&lon=-73.48182&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=67161734,67161735,64979948,64979945 '''Service Plaza''']<br/>I-95 N & S || 3/22/2012<br/>(AndyPoms) || Unknown || '''SERVICE PLAZAS CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
+
| [https://www.waze.com/editor/?env=usa&lon=-73.28696&lat=41.87911&layers=4&zoom=2&segments=66123554 '''Cornwall Hollow Rd''']<br/>btwn Johnson and Lake || 2014-08-28 0900<br/>(pumrum) || 2014-09-24 1500<br/>(pumrum) || '''Added to Closure List || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=550198 CT-DOT Project 0031-0128]
 
|-
 
|-
 
|}
 
|}
  
== Fairfield ==
+
== Darien ==
 
{| border="1" width="100%"
 
{| border="1" width="100%"
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
Line 62: Line 99:
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="100" bgcolor="wheat"| Link
 
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center" bgcolor="#00FF00"
 
| [https://www.waze.com/editor/?zoom=6&lat=41.21865&lon=-73.25648&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=66452345,66452322,66452363,66452341 '''Service Plaza''']<br/>CT-15 N & S || 5/7/2012<br/>(Jallen) || '''NB:'''12/12/12 (AndyPoms)<br/>'''SB:'''2/1/13 (AndyPoms) || '''REOPENED<br/><del>SERVICE PLAZAS CLOSED</del>'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
 
|-
 
 
|- align="center"
 
|- align="center"
| [https://www.waze.com/editor/?zoom=7&lat=41.19241&lon=-73.22853&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=70328590 '''Cornell Rd''']<br/>b/w Westbrook Pl & White Oak Rd || 10/12/2012<br/>(AndyPoms) || Anticipated<br/>12/2012-1/2013 || '''BRIDGE REPLACEMENT'''<br/><del>'''REOPENED'''</del><br/><del>'''BRIDGE REPLACEMENT'''</del><br/>Roads will be closed to ALL thru traffic but will be open for local traffic leading up to the bridge construction area. '''NOTE:''' AM AndyPoms reopened on 12/22 in response to several new MPs crossing the bridge (indicating it was open) on 12/28 two URs came in indicating bridge was still closed - AndyPoms disconnected it again. || [http://www.fairfieldct.org/documents/2012/CornellRd.pdf Town of Fairfield]
+
| [https://www.waze.com/editor/?zoom=3&lat=41.07547&lon=-73.48182&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=67161734,67161735,64979948,64979945 '''Service Plaza''']<br/>I-95 N & S || 3/22/2012<br/>(AndyPoms) || '''NB:'''6/6/2013<br/>(AndyPoms) || '''SERVICE PLAZAS CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
 
|-
 
|-
|- align="center"
+
|}
| [https://www.waze.com/editor/?zoom=7&lat=41.20099&lon=-73.22959&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=68382338 '''Merritt St''']<br/>at Valley Rd || 11/27/2012<br/>(AndyPoms) || Anticipated<br/>7/2013 || '''BRIDGE REPLACEMENT'''<br/>Street is closed to all thru traffic, but open for local traffic leading up to the bridge construction area. || [http://www.fairfieldct.org/ Town of Fairfield]
+
 
 +
== Fairfield ==
 +
 
 +
{| border="1" width="100%"
 
|-
 
|-
 +
! scope="col" width="200" bgcolor="wheat" | Road Name<br/>Cross Streets
 +
! scope="col" width="40" bgcolor="wheat" | Start Date<br/>(Username)
 +
! scope="col" width="40" bgcolor="wheat" | End Date<br/>(Username)
 +
! scope="col" width="500" bgcolor="wheat" | Notes
 +
! scope="col" width="100" bgcolor="wheat" | Link
 +
|- align="center"
 +
| [https://www.waze.com/editor/?zoom=6&lat=41.21865&lon=-73.25648&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=66452345,66452322,66452363,66452341 <b>Service Plaza</b>]<br/>I-95 N & S
 +
| '''NB:'''7/18/2013<br/>(AndyPoms)<br/>'''SB:'''9/26/2103<br/>(AndyPoms)
 +
| Unknown
 +
| '''SERVICE PLAZAS CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas
 +
| [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
 
|}
 
|}
  
Line 82: Line 130:
 
|- align="center"
 
|- align="center"
 
| [https://www.waze.com/editor/?zoom=6&lat=41.04075&lon=-73.67312&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=68283705,68283704,68283701,68283711,68283710,68283707 '''Service Plaza''']<br/>CT-15 N & S || 2/1/2013<br/>(AndyPoms) || Unknown || '''SERVICE PLAZAS CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
 
| [https://www.waze.com/editor/?zoom=6&lat=41.04075&lon=-73.67312&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=68283705,68283704,68283701,68283711,68283710,68283707 '''Service Plaza''']<br/>CT-15 N & S || 2/1/2013<br/>(AndyPoms) || Unknown || '''SERVICE PLAZAS CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
|-
 
 
|}
 
|}
  
Line 92: Line 139:
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="100" bgcolor="wheat"| Link
 
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
+
|- align="center" bgcolor="#00ff00"
| [https://www.waze.com/editor/?zoom=7&lat=41.60993&lon=-71.9391&layers=BTTFFTTTTFTTTTTTTTTTTTFTT&segments=72142079 '''Edmond Rd''']<br/>b/w Hopeville Rd & Dudek Rd || 3/29/2013<br/>(AndyPoms) || Anticipated<br/>11/2013 || '''BRIDGE REPLACEMENT'''<br/>The Edmond Road Bridge will be closing for replacement on March 20, 2013 and will re-open to traffic in late November.  During the construction period, a detour will direct trafficaround the closure via Norman Road.  
+
| [https://www.waze.com/editor/?zoom=7&lat=41.60993&lon=-71.9391&layers=BTTFFTTTTFTTTTTTTTTTTTFTT&segments=72142079 '''Edmond Rd''']<br/>b/w Hopeville Rd & Dudek Rd || 3/29/2013<br/>(AndyPoms) || 1/30/2014<br/>(AndyPoms - MP) || '''BRIDGE REPLACEMENT'''<br/>The Edmond Road Bridge will be closing for replacement on March 20, 2013 and will re-open to traffic in late November.  During the construction period, a detour will direct trafficaround the closure via Norman Road.  
 
  || [http://www.griswold-ct.org/ Town of Griswold]
 
  || [http://www.griswold-ct.org/ Town of Griswold]
 
|-
 
|-
 
|}
 
|}
  
== Hamden ==
+
== Hartford ==
 
{| border="1" width="100%"
 
{| border="1" width="100%"
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
Line 105: Line 152:
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="100" bgcolor="wheat"| Link
 
! scope="col" width="100" bgcolor="wheat"| Link
 +
|- align="center" bgcolor="#00ff00"
 +
| [https://www.waze.com/editor/?zoom=6&lat=41.7469&lon=-72.67183&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=9003282 '''Elliott St E''']<br/>b/w Wethersfield & Ledyard St || 10/14/2012<br/>(AndyPoms) || 11/12/2012<br/>(AndyPoms) || '''REOPENED<br/><del>ROAD CLOSED</del>''' <br/>MDC Sewer Separation Project || [http://www.mdc-roadclosures.com/ MDC]
 +
|- align="center" bgcolor="#ffff00"
 +
| [https://www.waze.com/editor/?zoom=7&lat=41.76565&lon=-72.68788&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=69664315,69664313 '''Flower St''']<br/>b/w Farmington & Capital || 11/27/2012<br/>(AndyPoms) || '''PERMANENT CLOSURE''' || '''ROAD PERMANENTLY CLOSED'''<br/>Busway Construction<br/>Closure Starts 12/3/2012 || [http://www.ctfastrak.com/index.php/en/component/content/article/22-construction-articles/149-construction-bulletin-november-26-2012 CT fastrak]
 
|- align="center"
 
|- align="center"
| [https://www.waze.com/editor/?zoom=5&lat=41.43258&lon=-72.90059&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=67825142 '''Tuttle Ave''']<br/>b/w Dunn Rd & River Rd || 12/4/2012<br/>(AndyPoms) || Spring<br/>2013 || '''BRIDGE REPLACEMENT'''<br/>Per Town Engineer/Hamden Help Desk: "prediction of completion of this project is a bit chancy, since the project is weather dependant.   At this time they do not promise,  but hope to have the Tuttle Avenue Bridge opened to traffic sometime in the Spring." || [http://www.hamden.com/ Town of Hamden]
+
| [https://www.waze.com/editor/?zoom=5&lat=41.79394&lon=-72.70343&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=8994280,9016890,9010620,9010622,9016713,9016893,8997086,9010497,8990817,9016888,8997085,8990904,64202390,64202389 '''Granby St''']<br/>b/w Tower & Ledyard || 10/14/2012<br/>(AndyPoms) || Unknown || '''ROAD CLOSED'''<br/>MDC Sewer Separation Project || [http://www.mdc-roadclosures.com/ MDC]
 +
|- align="center"
 +
| [https://www.waze.com/editor/?env=usa&lon=-72.67731&lat=41.76536&layers=2021&zoom=7&segments=9010019 '''Jewell St''']<br/>b/w Ann Uccello St and Trumbull St || Approx<br/>7/14/2014<br/>(ploben) || Unknown || '''WESTBOUND TRAFFIC CLOSED''' || First Hand
 +
|- align="center" bgcolor="#00FF00"
 +
| [https://www.waze.com/editor/?zoom=6&lat=41.77651&lon=-72.6908&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=9014765 '''Sigourney St.''']<br/>b/w Homestead & Sargent || 4/1/2012<br/>(AndyPoms) || 6/13/2013<br/>(AndyPoms) || '''REOPENED'''<br/><del>'''ROAD CLOSED'''</del><br/>Bridge Replacement || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=500982 ConnDOT]
 
|-
 
|-
 
|}
 
|}
 +
'''*NOTE:''' The MDC only publishes approximately two weeks of closure & traffic pattern change information.  Most MDC Projects only impact roads M-F 7am-6pm. Only edit the map for ''CONFIRMED'' round-the-clock closures/traffic pattern changes.
 +
 +
== Ledyard==
  
== Hartford ==
 
 
{| border="1" width="100%"
 
{| border="1" width="100%"
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
Line 117: Line 174:
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="100" bgcolor="wheat"| Link
 
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center" bgcolor="#00ff00"
 
| [https://www.waze.com/editor/?zoom=6&lat=41.7469&lon=-72.67183&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=9003282 '''Elliott St E''']<br/>b/w Wethersfield & Ledyard St || 10/14/2012<br/>(AndyPoms) || 11/12/2012<br/>(AndyPoms) || '''REOPENED<br/><del>ROAD CLOSED</del>''' <br/>MDC Sewer Separation Project || [http://www.mdc-roadclosures.com/ MDC]
 
|- align="center" bgcolor="#ffff00"
 
| [https://www.waze.com/editor/?zoom=7&lat=41.76565&lon=-72.68788&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=69664315,69664313 '''Flower St''']<br/>b/w Farmington & Capital || 11/27/2012<br/>(AndyPoms) || '''PERMANENT CLOSURE''' || '''ROAD PERMANENTLY CLOSED'''<br/>Busway Construction<br/>Closure Starts 12/3/2012 || [http://www.ctfastrak.com/index.php/en/component/content/article/22-construction-articles/149-construction-bulletin-november-26-2012 CT fastrak]
 
 
|- align="center"
 
|- align="center"
| [https://www.waze.com/editor/?zoom=5&lat=41.79394&lon=-72.70343&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=8994280,9016890,9010620,9010622,9016713,9016893,8997086,9010497,8990817,9016888,8997085,8990904,64202390,64202389 '''Granby St''']<br/>b/w Tower & Ledyard || 10/14/2012<br/>(AndyPoms) || Unknown || '''ROAD CLOSED'''<br/>MDC Sewer Separation Project || [http://www.mdc-roadclosures.com/ MDC]
+
| [https://www.waze.com/editor/?env=usa&lon=-71.99587&lat=41.48072&layers=1925&zoom=3&segments=75296138,75296137 '''Shewville Rd''']<br/>b/w Fanning & Rte 2 || Approx<br/>7/1/2014<br/>(GooberKing) || Approx<br/>9/30/2014<br/>(GooberKing) || '''ROAD CLOSED'''<br/>Bridge replacement || [http://www.norwichbulletin.com/article/20140719/News/140719546 Norwich Bulletin]
|- align="center"
+
| [https://www.waze.com/editor/?zoom=6&lat=41.77651&lon=-72.6908&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=9014765 '''Sigourney St.''']<br/>b/w Homestead & Sargent || 4/1/2012<br/>(AndyPoms) || Anticipated<br/>6/30/2013 || '''ROAD CLOSED'''<br/>Bridge Replacement || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=500982 ConnDOT]
+
 
|-
 
|-
 
|}
 
|}
'''*NOTE:''' The MDC only publishes approximately two weeks of closure & traffic pattern change information.  Most MDC Projects only impact roads M-F 7am-6pm. Only edit the map for ''CONFIRMED'' round-the-clock closures/traffic pattern changes.
 
  
== Killingly ==
+
== Madison ==
 
{| border="1" width="100%"
 
{| border="1" width="100%"
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
Line 136: Line 186:
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="100" bgcolor="wheat"| Link
 
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center" bgcolor="#00ff00"
+
|- align="center"
| [https://www.waze.com/editor/?lon=-71.84612&lat=41.88521&zoom=7&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=68923654 '''River Rd''']<br/>b/w Mason Hill Rd & Cutler Rd || 10/26/2012<br/>(AndyPoms) || 11/3/2012<br/>(AndyPoms) || '''REOPENED'''<br/><del>'''BRIDGE REPLACEMENT'''</del><br/>Only the bridge is closed, Road is open to local traffic. Awaiting reply from town about anticipated reopening.<br/>'''UPDATE 11/3/2012:''' According to Town Manager, There are two bridges on River Road in Killingly.  Both bridges were closed to traffic in April 2011 due to storm damage.  Both bridges have been replaced and open on Monday 10-29-12. (AP Note: Of Course we get the UR 3 days before they reopened...) || [http://www.killingly.org/ Town of Killingly]
+
| [https://www.waze.com/editor/?zoom=6&lat=41.29088&lon=-72.58042&layers=TBTTFFTTTTTTTTTTTTTTTTTFTT '''Service Plaza''']<br/>I-95 N & S || NB:10/3/2013<br/>(AndyPoms)<br/>SB:TBA || UNKNOWN|| '''SERVICE PLAZA CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
 
|-
 
|-
 
|}
 
|}
  
== Meriden ==
+
== Manchester ==
 
{| border="1" width="100%"
 
{| border="1" width="100%"
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
Line 148: Line 198:
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="100" bgcolor="wheat"| Link
 
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center" bgcolor="#00ff00"
+
|- align="center" bgcolor="white"
| [https://www.waze.com/editor/?zoom=6&lat=41.53042&lon=-72.80951&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=66580324 '''Cook Ave''']<br/>b/w Summer St & Meridian St || 10/10/2012<br/>(AndyPoms) || 12/12/2012<br/>(AndyPoms) || '''REOPENED'''<br/><del>'''ROAD CLOSED'''</del><br/>Bridge Replacement<br/>CT DOT Project 79-215. || [http://www.cityofmeriden.org/SpecialAnnouncements/Customer-Files/CT-DOT-Project79-Rt71-Reconstruction.pdf ConnDOT]
+
| [https://www.waze.com/editor/?env=usa&lon=-72.53006&lat=41.77556&layers=2021&zoom=6&segments=80957668 '''Edgarton St''']<br/>btwn Lodge Dr & Edgarton St || 01/01/2010<br/>(ploben) || Unplanned<br/>(ploben) || '''Sinkhole || [http://www.journalinquirer.com/towns/manchester/edgerton-street-sinkhole-causing-headaches-in-manchester/article_f641da82-4ceb-5899-8987-f715ce668d63.html Article]
 
|-
 
|-
 
|}
 
|}
Line 162: Line 212:
 
|- align="center"
 
|- align="center"
 
| [https://www.waze.com/editor/?zoom=4&lat=41.57082&lon=-72.6487&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=65478194,65478199,63883313,62901442 '''Arrigoni Br''']<br/>b/w Middletown & Portland || 5/1/2011<br/>(AndyPoms) || Anticipated<br/>11/7/2012 || '''ONE LANE EACH DIRECTION'''<br/>Bridge Replacement<br/>No Closures-traffic pattern changes.<br/>'''Silver St''' b/w Brownstone and Main-One Way Westbound. || [http://www.ct.gov/dot/Arrigoni ConnDOT]
 
| [https://www.waze.com/editor/?zoom=4&lat=41.57082&lon=-72.6487&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=65478194,65478199,63883313,62901442 '''Arrigoni Br''']<br/>b/w Middletown & Portland || 5/1/2011<br/>(AndyPoms) || Anticipated<br/>11/7/2012 || '''ONE LANE EACH DIRECTION'''<br/>Bridge Replacement<br/>No Closures-traffic pattern changes.<br/>'''Silver St''' b/w Brownstone and Main-One Way Westbound. || [http://www.ct.gov/dot/Arrigoni ConnDOT]
 +
|-
 +
|- align="center"
 +
| [https://www.waze.com/editor/?env=usa&lon=-72.66378&lat=41.52602&layers=4&zoom=6&segments=81381241,8928840,81381239 '''RT 17 / S Main''']<br/>at Coleman Rd || 2014-09-05 7pm<br/>(pumrum) || <br/>2014-09-08 3pm (pumrum)|| '''ROAD CLOSED'''<br/>btwn Route 155 (Randolph Road) and Wesleyan Hills Road || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=552066 ConnDOT]
 
|-
 
|-
 
|}
 
|}
  
== Montville ==
+
== Monroe ==
 
{| border="1" width="100%"
 
{| border="1" width="100%"
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
Line 173: Line 226:
 
! scope="col" width="100" bgcolor="wheat"| Link
 
! scope="col" width="100" bgcolor="wheat"| Link
 
|- align="center"
 
|- align="center"
| [https://www.waze.com/editor/?zoom=5&lat=41.47328&lon=-72.11724&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=64022292,66570467,66570466 '''Service Plaza''']<br/>I-395 S || 10/22/2012<br/>(AndyPoms) || Unknown || '''SERVICE PLAZA CLOSED'''<br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
+
| [https://www.waze.com/editor/?env=usa&lon=-73.21305&lat=41.31986&layers=4&zoom=7&segments=81024859 '''Monroe Tpke''']<br/>b/w Cross Hill & Jeanette || 2014-08-11 0600<br/>(pumrum) || 2014-08-21 0600<br>(pumrum) || '''BRIDGE CLOSED'''<br/>Submitted to closure sheet || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=548900 ConnDOT]
|-
+
|- align="center"
+
| [https://www.waze.com/editor/?zoom=8&lat=41.50205&lon=-72.12262&layers=BTTFTTTTTTTTTTTTTTTTFT&segments=69065802 '''Montville Rd''']<br/>b/w Salen Tpke & Leffingwell Rd || 11/1/2012<br/>(AndyPoms) || Unplanned || '''BRIDGE OUT'''<br/>AP doing more research - confirmed by aerials UR: "montville road has been closed for about 7 years. in a storm the bridge washed out." || User Report
+
 
|-
 
|-
 
|}
 
|}
  
== New Britain ==
+
== Montville ==
 
{| border="1" width="100%"
 
{| border="1" width="100%"
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
Line 188: Line 238:
 
! scope="col" width="100" bgcolor="wheat"| Link
 
! scope="col" width="100" bgcolor="wheat"| Link
 
|- align="center"
 
|- align="center"
| [https://www.waze.com/editor/?zoom=5&lat=41.68509&lon=-72.8097&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=69436156 '''Long Swamp Rd''']<br/>b/w Slater Rd & Alton Brooks Way || 11/17/2012<br/>(AndyPoms) || Unknown || '''ROAD CLOSED'''<br/>'''UR:''' "Access to Long Swamp Rd from Slater Rd no longer allowed.  New access road is Alton Brooks Way."<br/><br/>AndyPoms took a drive to confirm & map new road (Alton Brooks Way) that does not match aerials.  Unknown if permanent closure of Long Swamp Rd or not. || User Report
+
| [https://www.waze.com/editor/?env=usa&lon=-72.12296&lat=41.50207&layers=263&zoom=7&segments=81021902,81021884 '''Montville Rd''']<br/>b/w Salen Tpke & Leffingwell Rd || 11/1/2012<br/>(AndyPoms) || Unknown || '''BRIDGE OUT'''<br/>AP doing more research - confirmed by aerials UR: "montville road has been closed for about 7 years. in a storm the bridge washed out."<br>Permit Process Begun (Jul 2014) || [http://www.theday.com/article/20140704/NWS01/307049906/1019 Latest News]
 +
|-
 +
|- align="center"
 +
| [https://www.waze.com/editor/?env=usa&lon=-72.15830&lat=41.46533&layers=4&zoom=6&segments=66654871 '''Oakdale Rd''']<br/>b/w Fellows Rd & Simpson Ln || 2014-05-14<br/>(pumrum) || 2014-10-14<br/>(pumrum) || '''BRIDGE MAINTENANCE''' || [http://www.theday.com/article/20140514/NWS01/140519860/1069/rss Closure Notice]<br>[http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=543974 DOT Notice]
 
|-
 
|-
 
|}
 
|}
  
== New Canaan ==
+
== New Britain ==
 
{| border="1" width="100%"
 
{| border="1" width="100%"
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
Line 200: Line 253:
 
! scope="col" width="100" bgcolor="wheat"| Link
 
! scope="col" width="100" bgcolor="wheat"| Link
 
|- align="center"
 
|- align="center"
| [https://www.waze.com/editor/?zoom=7&lat=41.1737&lon=-73.47857&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=71296327 '''Mariomi Rd''']<br/>b/w Valley Rd & Thayer Pond Rd || 2/15/2013<br/>(AndyPoms) || Approx<br/>5/2013 || '''BRIDGE REPLACEMENT'''<br/>Started May, 2012, reported by user Feb, 2013Project anticipated to last 1 year. || [http://www.newcanaan.info/controls/NewsFeed.aspx?FeedID=337 Town of New Canaan]
+
| [https://www.waze.com/editor/?zoom=5&lat=41.68509&lon=-72.8097&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=69436156 '''Long Swamp Rd''']<br/>b/w Slater Rd & Alton Brooks Way || 11/17/2012<br/>(AndyPoms) || Unknown || '''ROAD CLOSED'''<br/>'''UR:''' "Access to Long Swamp Rd from Slater Rd no longer allowedNew access road is Alton Brooks Way."<br/><br/>AndyPoms took a drive to confirm & map new road (Alton Brooks Way) that does not match aerials. Unknown if permanent closure of Long Swamp Rd or not. || User Report
 
|-
 
|-
 
|}
 
|}
Line 211: Line 264:
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="100" bgcolor="wheat"| Link
 
! scope="col" width="100" bgcolor="wheat"| Link
 +
|- align="center" bgcolor="#00ff00"
 +
| [https://www.waze.com/editor/?zoom=7&lat=41.33042&lon=-72.90915&layers=BTTFFTTTTFTTTTTTTTTTTTFTT&segments=9043024 '''E Rock Rd.''']<br/>b/w Livingston & Farnum || 6/14/2013<br/>(AndyPoms) || 4/30/2015<br/>(AndyPoms) || '''REOPENED'''<br/><del>'''ROAD CLOSED'''</del><br/>Bridge Replacement || [http://www.eastrockbridge.com/ E Rock Brg]
 
|- align="center" bgcolor="#ffff00"
 
|- align="center" bgcolor="#ffff00"
 
| [https://www.waze.com/editor/?zoom=6&lat=41.31624&lon=-72.90678&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=9063062 '''CT-34''']<br/>At Exit 2 || 5/1/2013<br/>(AndyPoms) || '''PERMANENT CLOSURE''' || '''ROAD PERMANENTLY CLOSED'''<br/>Downtown Crossing Project<br/>Closure Starts 5/2/2013 || [http://www.cityofnewhaven.com/Mayor/ReadMore.asp?ID={DEBDCB38-A728-4567-9D10-836C7DD23432} City of New Haven]
 
| [https://www.waze.com/editor/?zoom=6&lat=41.31624&lon=-72.90678&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=9063062 '''CT-34''']<br/>At Exit 2 || 5/1/2013<br/>(AndyPoms) || '''PERMANENT CLOSURE''' || '''ROAD PERMANENTLY CLOSED'''<br/>Downtown Crossing Project<br/>Closure Starts 5/2/2013 || [http://www.cityofnewhaven.com/Mayor/ReadMore.asp?ID={DEBDCB38-A728-4567-9D10-836C7DD23432} City of New Haven]
 
|- align="center"
 
|- align="center"
| [https://www.waze.com/editor/?zoom=6&lat=41.31624&lon=-72.90678&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=9063062 '''State St.''']<br/>b/w Lawrence & James || 10/12/2010<br/>(AndyPoms) || Anticipated<br/><del>10/2011</del><br/><del>2/2012</del><br/>4/30/2013 || '''ROAD CLOSED'''<br/>Bridge Replacement (CT DOT Project #0092-0561) || [http://www.gm2inc.com/projects/state-street/ ConnDOT]
+
| [https://www.waze.com/editor/?zoom=6&lat=41.31624&lon=-72.90678&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=9063062 '''State St.''']<br/>b/w Lawrence & James || 10/12/2010<br/>(AndyPoms) || Anticipated<br/><del>10/2011</del><br/><del>2/2012</del><br/><del>4/30/2013</del><br/>Unknown || '''ROAD CLOSED'''<br/>Bridge Replacement (CT DOT Project #0092-0561) || [http://www.gm2inc.com/projects/state-street/ ConnDOT]
 
|- align="center" bgcolor="#00ff00"
 
|- align="center" bgcolor="#00ff00"
 
| [https://www.waze.com/editor/?zoom=6&lat=41.31229&lon=-72.92109&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=61834533,9079895 '''Trumbull St.''']<br/>b/w Orange & Whitney || 11/28/2011<br/>(AndyPoms) || 3/12/2013<br/>(AndyPoms) || '''REOPENED TWO WAY'''<br/><del>'''ONE WAY''' (WESTBOUND)</del><br/>Sewer Separation Project || [http://www.cityofnewhaven.com/TrafficParking/advisories.asp City of New Haven]
 
| [https://www.waze.com/editor/?zoom=6&lat=41.31229&lon=-72.92109&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=61834533,9079895 '''Trumbull St.''']<br/>b/w Orange & Whitney || 11/28/2011<br/>(AndyPoms) || 3/12/2013<br/>(AndyPoms) || '''REOPENED TWO WAY'''<br/><del>'''ONE WAY''' (WESTBOUND)</del><br/>Sewer Separation Project || [http://www.cityofnewhaven.com/TrafficParking/advisories.asp City of New Haven]
Line 224: Line 279:
 
|}
 
|}
  
== Norwalk ==
+
== Newtown ==
 
{| border="1" width="100%"
 
{| border="1" width="100%"
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
Line 232: Line 287:
 
! scope="col" width="100" bgcolor="wheat"| Link
 
! scope="col" width="100" bgcolor="wheat"| Link
 
|- align="center"
 
|- align="center"
| [https://www.waze.com/editor/?zoom=7&lat=41.10486&lon=-73.42863&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=61941471 '''Cedar St.''']<br/>b/w Connecticut Ave (US-1) & Summit Ave || 8/21/2012<br/>(AndyPoms) || Anticipated<br/>11/2013 || '''ROAD CLOSED'''<br/>Bridge Replacement || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=508658 ConnDOT]
+
| [https://www.waze.com/editor/?zoom=7&lat=41.43614&lon=-73.24723&layers=BTTFFTTTTFTTTTTTTTTTTTFTT&segments=9159130 '''Center St''']<br/>b/w Underhill Rd & Lake Dr || 7/15/2013<br/>(AndyPoms) || Approx<br/>8/2/2013 || '''ROAD CLOSED'''<br/>for overhead bridge rehibilitation || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=527892 ConnDOT]
 
|-
 
|-
 +
|}
 +
 +
== Norwalk ==
 +
{| border="1" width="100%"
 +
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
 +
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
 +
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
 +
! scope="col" width="500" bgcolor="wheat"| Notes
 +
! scope="col" width="100" bgcolor="wheat"| Link
 
|- align="center"
 
|- align="center"
| [https://www.waze.com/editor/?zoom=6&lat=41.10894&lon=-73.39377&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=67027891 '''Triangle St.''']<br/>b/w Norden Plaza & Howard Ave || 7/29/2012<br/>(AndyPoms) || Anticipated<br/>11/8/2012 || '''ROAD CLOSED'''<br/>Bridge Replacement || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=502644 ConnDOT]
+
| [https://editor-beta.waze.com/editor/?zoom=6&lat=41.10465&lon=-73.42821&layers=TBTTFFTTTTFTTTTTTTTTTTTTTT&segments=64073136&env=usa '''Fairfield Ave''']<br/>b/w Connecticut Ave (US-1) & Reed St Ext || 12/5/2013<br/>(AndyPoms) || Winter 2014 || '''ROAD CLOSED'''<br/>Bridge Replacement<br/>Set Segment Restrictions from 11/11/2013 to 12/31/2014 as CT DOT says "Winter of 2014" as the end date. || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=533482 ConnDOT]
 
|-
 
|-
|- align="center" bgcolor="#00ff00"
+
|- align="center"
| [https://www.waze.com/editor/?zoom=6&lat=41.09842&lon=-73.43953&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=67306886 '''Rampart Rd''']<br/>b/w Connecticut Ave & Jomar Rd || 2/10/2012<br/>(Jallen) || 8/13/2012<br/>(jeberhard) || '''REOPENED'''<br/><del>'''ROAD CLOSED'''</del><br/>Bridge Replacement || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=475858 ConnDOT]
+
| [https://editor-beta.waze.com/editor/?zoom=6&lat=41.10465&lon=-73.42821&layers=TBTTFFTTTTFTTTTTTTTTTTTTTT&segments=61941475&env=usa '''Taylor Ave''']<br/>b/w Connecticut Ave (US-1) & Church St || 12/5/2013<br/>(AndyPoms) || Winter 2014 || '''ROAD CLOSED'''<br/>Bridge Replacement<br/>Set Segment Restrictions from 11/11/2013 to 12/31/2014 as CT DOT says "Winter of 2014" as the end date. || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=533482 ConnDOT]
 
|-
 
|-
 
|}
 
|}
Line 254: Line 318:
 
|}
 
|}
  
== Plainfield ==
+
== Plainville ==
 
{| border="1" width="100%"
 
{| border="1" width="100%"
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
Line 261: Line 325:
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="100" bgcolor="wheat"| Link
 
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center" bgcolor="#00ff00"
+
|- align="center" bgcolor="#00FF00"
| [https://www.waze.com/editor/?zoom=5&lat=41.75423&lon=-71.87763&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=64988394,66455378,64988391,66455452 '''Service Plaza''']<br/>I-395 N & S || 6/21/2012<br/>(AndyPoms) || 10/22/2012<br/>(AndyPoms) || '''REPOPENED'''<br/><del>'''SERVICE PLAZAS CLOSED'''</del><br/>Part of reconstruction project of all CT Service Plazas || [http://ctserviceplazas.com/ctserviceplazas/RenovationNews.aspx CT Service Plazas]
+
| [https://editor-beta.waze.com/usa/#?zoom=6&lat=41.65685&lon=-72.85982&layers=TBTTFFTTTTFTTTTTTTTTTTTFTT&segments=74557145 '''Stillwell Dr''']<br/>b/w Linsley Dr & Rosemont Dr|| 7/21/2013<br/>(AndyPoms) || 2/22/2014<br/>(AndyPoms) || '''BRIDGE REPLACEMENT'''<br/>Construction will begin on March 18, 2013 to replace the Stillwell Drive Bridge over the Quinnipiac River. || [http://www.plainvillect.com/News/news_details.aspx?id=1569 Plainville]
 
|-
 
|-
 
|}
 
|}
Line 278: Line 342:
 
|}
 
|}
  
== Stamford ==
+
== Rockville ==
 
{| border="1" width="100%"
 
{| border="1" width="100%"
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
Line 285: Line 349:
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="100" bgcolor="wheat"| Link
 
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center"
+
|- align="center" bgcolor="white"
| [https://www.waze.com/editor/?zoom=7&lat=41.0547&lon=-73.55461&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=9151240 '''Edison Rd''']<br/>b/w Merrell Ave & Stamford Hospital || 11/17/2012<br/>(AndyPoms) || Unknown || '''ROAD CLOSED'''<br/>UR: "Edison Rd is closed indefinitely for construction." - Stamford Hospital Expansion Project || [http://www.stamfordhospital.org/ Stamford Hospital]
+
| [https://www.waze.com/editor/?env=usa&lon=-72.46361&lat=41.86565&layers=2021&zoom=6&segments=9137502 '''W Main St''']<br/>btwn West St & Maple St || 04/01/2014<br/>(ploben) || 11/01/2014<br/>(ploben) || '''BRIDGE CONSTRUCTION || [http://www.vernon-ct.gov/files/Engineering/2014/West%20Main%20Detour.pdf]
 
|-
 
|-
 
|}
 
|}
 
+
== Stamford ==
== Trumbull ==
+
 
{| border="1" width="100%"
 
{| border="1" width="100%"
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
 
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
Line 297: Line 360:
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="500" bgcolor="wheat"| Notes
 
! scope="col" width="100" bgcolor="wheat"| Link
 
! scope="col" width="100" bgcolor="wheat"| Link
|- align="center" bgcolor="#00ff00"
+
|- align="center"
| [https://www.waze.com/editor/?zoom=5&lat=41.23206&lon=-73.23212&layers=BTTFTTTFTTTTTTTTTTTTFT&segments=9189413 '''Madison Ave''']<br/>b/w Plattsville Rd & Hitching Post Ln || 7/9/2012<br/>(AndyPoms) || 9/28/2012<br/>(AndyPoms) ||'''REOPENED'''<br/><del>'''ROAD CLOSED'''</del><br/>Bridge Replacement || [http://www.ct.gov/dot/cwp/view.asp?A=2135&Q=507618 ConnDOT]
+
| [https://www.waze.com/editor/?zoom=7&lat=41.0547&lon=-73.55461&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=9151240 '''Edison Rd''']<br/>b/w Merrell Ave & Stamford Hospital || 11/17/2012<br/>(AndyPoms) || Unknown || '''ROAD CLOSED'''<br/>UR: "Edison Rd is closed indefinitely for construction." - Stamford Hospital Expansion Project || [http://www.stamfordhospital.org/ Stamford Hospital]
 
|-
 
|-
 
|}
 
|}
Line 314: Line 377:
 
|- align="center"
 
|- align="center"
 
| [https://www.waze.com/editor/?zoom=7&lat=41.12165&lon=-73.37136&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=9190067 '''Ketchum St''']<br/>b/w Riverside Ave & #7 Ketchum || 2/8/2013<br/>(AndyPoms) || Approx<br/>4/14/2013 || '''ROAD CLOSED'''<br/>Road Closed between Riverside Ave and 7 Ketchum St to complete road reconstruction.  See link to right, Item #12 || [http://www.westportct.gov/Modules/ShowDocument.aspx?documentid=4244 Town of Westport]
 
| [https://www.waze.com/editor/?zoom=7&lat=41.12165&lon=-73.37136&layers=BTTFFTTTFTTTTTTTTTTTTFT&segments=9190067 '''Ketchum St''']<br/>b/w Riverside Ave & #7 Ketchum || 2/8/2013<br/>(AndyPoms) || Approx<br/>4/14/2013 || '''ROAD CLOSED'''<br/>Road Closed between Riverside Ave and 7 Ketchum St to complete road reconstruction.  See link to right, Item #12 || [http://www.westportct.gov/Modules/ShowDocument.aspx?documentid=4244 Town of Westport]
 +
|-
 +
|}
 +
 +
== Wolcott ==
 +
{| border="1" width="100%"
 +
! scope="col" width="200" bgcolor="wheat"| Road Name<br/>Cross Streets
 +
! scope="col" width="40" bgcolor="wheat"| Start Date<br/>(Username)
 +
! scope="col" width="40" bgcolor="wheat"| End Date<br/>(Username)
 +
! scope="col" width="500" bgcolor="wheat"| Notes
 +
! scope="col" width="100" bgcolor="wheat"| Link
 +
|- align="center" bgcolor="#00FF00"
 +
| [https://www.waze.com/editor/?zoom=5&lat=41.59671&lon=-72.96113&layers=BFTFFTTTTTTTFTTTTTTTTTFTT&segments=9064807 '''Center St''']<br/>at Woodtick Rd || 6/27/2013<br/>(CTGreybeard) || 9/29/2013<br/>(AndyPoms/UR) || '''ROAD CLOSED'''<br/>Road Construction at the intersection of Center Street and Woodtick Road See link at right. || [http://www.wolcottct.org/news/news_details.aspx?id=503 Town of Wolcott]
 
|-
 
|-
 
|}
 
|}
Line 327: Line 402:
 
|- align="center"
 
|- align="center"
 
| [https://www.waze.com/editor/?zoom=5&lat=41.1185&lon=-73.50142&layers=BTTFTTTFTTTTTTTTTTTTFT '''Yale Ave''']<br/>b/w Derby & Chapel || Approx<br/>8/1/20XX<br/>(USER) || Approx<br/>9/7/20XX<br/>(USER) || '''ROAD CLOSED'''<br/>Annual Closure for<br/>New Haven Open Tennis Tournament || [http://www.newhavenopen.com/ NH Open]
 
| [https://www.waze.com/editor/?zoom=5&lat=41.1185&lon=-73.50142&layers=BTTFTTTFTTTTTTTTTTTTFT '''Yale Ave''']<br/>b/w Derby & Chapel || Approx<br/>8/1/20XX<br/>(USER) || Approx<br/>9/7/20XX<br/>(USER) || '''ROAD CLOSED'''<br/>Annual Closure for<br/>New Haven Open Tennis Tournament || [http://www.newhavenopen.com/ NH Open]
 +
|- align="center"
 +
| [https://www.waze.com/editor/?env=usa&lon=-72.84646&lat=41.64982&layers=3047&zoom=6&segments=8977100 '''Shuttle Meadow Rd''']<br/>b/w Flanders & Ledge || Approx<br/>4/15/20XX<br/>(USER) || Approx<br/>11/15/20XX<br/>(USER) || '''ROAD CLOSED'''<br/>Seasonal Closure per<br/>Southington PD ||
 
|-
 
|-
 +
 
|}
 
|}
  
Line 345: Line 423:
  
 
[[Category:Connecticut]]
 
[[Category:Connecticut]]
 +
[[Category:Make Subpage]]

Latest revision as of 01:51, 7 March 2017


Use this page to keep track of LONG TERM road closures and changes to traffic flow in the State of Connecticut. Please note start and (anticipated) end dates as well as a link to more information about the project (if available). Be sure to read Real time closures before making changes to the map and this page.

Waze is now consistently updating NA map tiles on a nightly basis. Map changes for road closures should be completed by 2200 UTC in order to be included in the nightly updates. At this time please only map closures that are in effect for more than two weeks. And be sure to go back and update the closures as soon as work is completed.

Major Events

These are Major Events that are submitted to WazeHQ on a regular basis, typically yearly.

What When Where Link Status
Hartford Marathon Yearly
2nd Sat in Oct
Hartford
E/W Hartford
Closures 2014 - In Progress
(pumrum)

Minor Events

These are Minor Events that are submitted via the closure sheet on a regular basis, typically yearly.

What When Where Link Status
Riverwalk Yearly
July 4th Wknd
Hartford
E Hartford
Closures 2014 - Submitted
(pumrum)
Manchester Road Race Yearly
Thanksgiving Day
Manchester [1] 2014 - Submitted
(pumrum)
First Night Hartford Yearly
New Years Eve
Hartford Event Site 2014 - Not Yet Submitted

Branford

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
I-95 N & S
6/28/2012
(AndyPoms)
NB:10/3/2013
(AndyPoms)
SB:Closed
SERVICE PLAZA CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Bridgeport

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Grant St
b/w Central & Mill Hill
6/28/2012
(AndyPoms)
Unknown PERMANENT CLOSURE
Creation of Grant St Plaza - pedestrian area in front of Bridgeport Hospital. Please leave the old (disconnected) segment as the plans show some form of access returning to the area (just no thru-traffic).
City of Bridgeport
South Ave
Under Amtrak
7/26/2013
(CTGreybeard)
1/1/2014 Replacement of Railroad Bridge No. 0853R Carrying the New Haven Rail line over South Avenue in the City of Bridgeport, Project #0301-0070 B Connecticut Master Transportation Plan (search for the project number)

Cheshire

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Blacks Rd
btwn SR-10 & Wolf Hill
2014-06-23
(pumrum)
2014-10-23 est
(pumrum)
Added to Closure List Town Closure Page

Cornwall

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Cornwall Hollow Rd
btwn Johnson and Lake
2014-08-28 0900
(pumrum)
2014-09-24 1500
(pumrum)
Added to Closure List CT-DOT Project 0031-0128

Darien

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
I-95 N & S
3/22/2012
(AndyPoms)
NB:6/6/2013
(AndyPoms)
SERVICE PLAZAS CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Fairfield

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
I-95 N & S
NB:7/18/2013
(AndyPoms)
SB:9/26/2103
(AndyPoms)
Unknown SERVICE PLAZAS CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Greenwich

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
CT-15 N & S
2/1/2013
(AndyPoms)
Unknown SERVICE PLAZAS CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Griswold

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Edmond Rd
b/w Hopeville Rd & Dudek Rd
3/29/2013
(AndyPoms)
1/30/2014
(AndyPoms - MP)
BRIDGE REPLACEMENT
The Edmond Road Bridge will be closing for replacement on March 20, 2013 and will re-open to traffic in late November. During the construction period, a detour will direct trafficaround the closure via Norman Road.
Town of Griswold

Hartford

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Elliott St E
b/w Wethersfield & Ledyard St
10/14/2012
(AndyPoms)
11/12/2012
(AndyPoms)
REOPENED
ROAD CLOSED

MDC Sewer Separation Project
MDC
Flower St
b/w Farmington & Capital
11/27/2012
(AndyPoms)
PERMANENT CLOSURE ROAD PERMANENTLY CLOSED
Busway Construction
Closure Starts 12/3/2012
CT fastrak
Granby St
b/w Tower & Ledyard
10/14/2012
(AndyPoms)
Unknown ROAD CLOSED
MDC Sewer Separation Project
MDC
Jewell St
b/w Ann Uccello St and Trumbull St
Approx
7/14/2014
(ploben)
Unknown WESTBOUND TRAFFIC CLOSED First Hand
Sigourney St.
b/w Homestead & Sargent
4/1/2012
(AndyPoms)
6/13/2013
(AndyPoms)
REOPENED
ROAD CLOSED
Bridge Replacement
ConnDOT

*NOTE: The MDC only publishes approximately two weeks of closure & traffic pattern change information. Most MDC Projects only impact roads M-F 7am-6pm. Only edit the map for CONFIRMED round-the-clock closures/traffic pattern changes.

Ledyard

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Shewville Rd
b/w Fanning & Rte 2
Approx
7/1/2014
(GooberKing)
Approx
9/30/2014
(GooberKing)
ROAD CLOSED
Bridge replacement
Norwich Bulletin

Madison

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
I-95 N & S
NB:10/3/2013
(AndyPoms)
SB:TBA
UNKNOWN SERVICE PLAZA CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Manchester

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Edgarton St
btwn Lodge Dr & Edgarton St
01/01/2010
(ploben)
Unplanned
(ploben)
Sinkhole Article

Middletown

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Arrigoni Br
b/w Middletown & Portland
5/1/2011
(AndyPoms)
Anticipated
11/7/2012
ONE LANE EACH DIRECTION
Bridge Replacement
No Closures-traffic pattern changes.
Silver St b/w Brownstone and Main-One Way Westbound.
ConnDOT
RT 17 / S Main
at Coleman Rd
2014-09-05 7pm
(pumrum)

2014-09-08 3pm (pumrum)
ROAD CLOSED
btwn Route 155 (Randolph Road) and Wesleyan Hills Road
ConnDOT

Monroe

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Monroe Tpke
b/w Cross Hill & Jeanette
2014-08-11 0600
(pumrum)
2014-08-21 0600
(pumrum)
BRIDGE CLOSED
Submitted to closure sheet
ConnDOT

Montville

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Montville Rd
b/w Salen Tpke & Leffingwell Rd
11/1/2012
(AndyPoms)
Unknown BRIDGE OUT
AP doing more research - confirmed by aerials UR: "montville road has been closed for about 7 years. in a storm the bridge washed out."
Permit Process Begun (Jul 2014)
Latest News
Oakdale Rd
b/w Fellows Rd & Simpson Ln
2014-05-14
(pumrum)
2014-10-14
(pumrum)
BRIDGE MAINTENANCE Closure Notice
DOT Notice

New Britain

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Long Swamp Rd
b/w Slater Rd & Alton Brooks Way
11/17/2012
(AndyPoms)
Unknown ROAD CLOSED
UR: "Access to Long Swamp Rd from Slater Rd no longer allowed. New access road is Alton Brooks Way."

AndyPoms took a drive to confirm & map new road (Alton Brooks Way) that does not match aerials. Unknown if permanent closure of Long Swamp Rd or not.
User Report

New Haven

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
E Rock Rd.
b/w Livingston & Farnum
6/14/2013
(AndyPoms)
4/30/2015
(AndyPoms)
REOPENED
ROAD CLOSED
Bridge Replacement
E Rock Brg
CT-34
At Exit 2
5/1/2013
(AndyPoms)
PERMANENT CLOSURE ROAD PERMANENTLY CLOSED
Downtown Crossing Project
Closure Starts 5/2/2013
City of New Haven
State St.
b/w Lawrence & James
10/12/2010
(AndyPoms)
Anticipated
10/2011
2/2012
4/30/2013
Unknown
ROAD CLOSED
Bridge Replacement (CT DOT Project #0092-0561)
ConnDOT
Trumbull St.
b/w Orange & Whitney
11/28/2011
(AndyPoms)
3/12/2013
(AndyPoms)
REOPENED TWO WAY
ONE WAY (WESTBOUND)
Sewer Separation Project
City of New Haven
I-95
b/w Exit 46 & Exit 54
June 2002
Anticipated
Fall 2016
MAJOR PROJECT
Expect Lane & Road & Ramp Closures at all times (mostly overnight)
I-95 New Haven
Yale Ave
b/w Derby & Chapel
7/30/2012
(AndyPoms)
8/30/2012
(AndyPoms)
REOPENED
ROAD CLOSED
Annual Closure for
New Haven Open Tennis Tournament
NH Open

Newtown

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Center St
b/w Underhill Rd & Lake Dr
7/15/2013
(AndyPoms)
Approx
8/2/2013
ROAD CLOSED
for overhead bridge rehibilitation
ConnDOT

Norwalk

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Fairfield Ave
b/w Connecticut Ave (US-1) & Reed St Ext
12/5/2013
(AndyPoms)
Winter 2014 ROAD CLOSED
Bridge Replacement
Set Segment Restrictions from 11/11/2013 to 12/31/2014 as CT DOT says "Winter of 2014" as the end date.
ConnDOT
Taylor Ave
b/w Connecticut Ave (US-1) & Church St
12/5/2013
(AndyPoms)
Winter 2014 ROAD CLOSED
Bridge Replacement
Set Segment Restrictions from 11/11/2013 to 12/31/2014 as CT DOT says "Winter of 2014" as the end date.
ConnDOT

Orange

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Service Plaza
CT-15 N & S
2/1/2013
(AndyPoms)
Unknown SERVICE PLAZAS CLOSED
Part of reconstruction project of all CT Service Plazas
CT Service Plazas

Plainville

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Stillwell Dr
b/w Linsley Dr & Rosemont Dr
7/21/2013
(AndyPoms)
2/22/2014
(AndyPoms)
BRIDGE REPLACEMENT
Construction will begin on March 18, 2013 to replace the Stillwell Drive Bridge over the Quinnipiac River.
Plainville

Redding

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Simpaug Tpke
b/w Marchant Rd & Picketts Ridge Rd
10/10/2011
(Jallen)
Anticipated
June 2012
10/29/2012
12/6/2012
Bridge Replacement
Replacement of the bridge over the Metro-North Railroad

Rockville

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
W Main St
btwn West St & Maple St
04/01/2014
(ploben)
11/01/2014
(ploben)
BRIDGE CONSTRUCTION [2]

Stamford

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Edison Rd
b/w Merrell Ave & Stamford Hospital
11/17/2012
(AndyPoms)
Unknown ROAD CLOSED
UR: "Edison Rd is closed indefinitely for construction." - Stamford Hospital Expansion Project
Stamford Hospital

Westport

This is the template for the tables in this page.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
North Ave
at Coleytown Rd
3/29/2013
(AndyPoms)
Approx
4/14/2013
BRIDGE REPLACEMENT
Road Closed north of Coleytown Rd to complete bridge reconstruction.
Town of Westport
Ketchum St
b/w Riverside Ave & #7 Ketchum
2/8/2013
(AndyPoms)
Approx
4/14/2013
ROAD CLOSED
Road Closed between Riverside Ave and 7 Ketchum St to complete road reconstruction. See link to right, Item #12
Town of Westport

Wolcott

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Center St
at Woodtick Rd
6/27/2013
(CTGreybeard)
9/29/2013
(AndyPoms/UR)
ROAD CLOSED
Road Construction at the intersection of Center Street and Woodtick Road See link at right.
Town of Wolcott

Annual Closures

This is a holding zone for closures/traffic changes that happen repeatedly so we don't have to recreate the table row for it each time.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
Yale Ave
b/w Derby & Chapel
Approx
8/1/20XX
(USER)
Approx
9/7/20XX
(USER)
ROAD CLOSED
Annual Closure for
New Haven Open Tennis Tournament
NH Open
Shuttle Meadow Rd
b/w Flanders & Ledge
Approx
4/15/20XX
(USER)
Approx
11/15/20XX
(USER)
ROAD CLOSED
Seasonal Closure per
Southington PD

Template

This is the template for the tables in this page.

Road Name
Cross Streets
Start Date
(Username)
End Date
(Username)
Notes Link
<ROAD NAME>
b/w <CROSS STREETS>
Approx
1/1/20XX
(<USER>)
Approx
9/7/20XX
(<USER>)
ROAD CLOSED
Description
<LINK>